emailrtcme@rtcme.comcall971 2 645 2662

Located in Sas Al Nakheel Abu Dhabi, the Male and Female High Schools of ADNOC consists of two separate buildings, 2 floors each and can accommodate a total of 800 students. Each of the school buildings also includes sport facilities such as basket ball, football and tennis and in addition to related structures such as roads, walkways, prayer areas, playgrounds, soft and hard landscaping, external shaded swimming pool and a car and a bus park. Borouge Innovation Centre, A polymer research facility, is one of only four similar initiatives developed globally.

Project Description

The Male and Female High Schools will be from grade 9 to grade 12. Each site comprises the main school building, service block, guard and drivers rooms, swimming pools and outdoor fields. The Borouge Innovation Centre consists of three major items, warehouse, labs and application hall, in addition to offices, common spaces and services. The project consists mainly:

  • Male High School of 400 students capacity.
  • Female High School of 400 students capacity
  • The Bouroge Innovation Centre of 75 employees capacity
Project Location

The proposed project is located in Sas Al Nakheel (Omm El Nar) at the northeast quadrant of the intersection of Abu Dhabi- Dubai Express Way (E10) and Abu Dhabi – Al Ain Express Way (E22).

Client

Abu Dhabi National Oil Company

Project

Traffic Impact study for ADNOC High Schools and Borouge Innovation Centre.

Role of RTC Consultants

RTC Consultants have been appointed by Engineering Consultants Group to undertake a Traffic Impact Study for the proposed ADNOC High Schools and Borouge Innovation Centre.

Scope of Works
  • Liaising with ADM and Traffic Police
  • Automatic and manual traffic counts for the surrounding road network(intersections and road segments)
  • Development trip generation, trip distribution, modal split and trip assignment.
  • Traffic impact analysis of the proposed development.
  • Parking requirements and design.
  • Site access and circulation.
  • Traffic impact study report
  • Addressing and incorporating ADM Comments.
Total Land Use

Male and Female High Schools-29,883 sqm Borouge Innovation Centre- 18,000 sqm

Project Completion Date

Male and Female School-Q4 2008 Borouge Innovation Centre-Q42011
For more information please contact
Mona Nasr, mnasr@rtcme.com

- CRTC CLIENTS -