emailrtcme@rtcme.comcall971 2 645 2662

Located in the centre of Abu Dhabi, on the New Airport Road, this expansive, three level complex will have a state- of- the- art Fish, Meat and Vegetable Market with more than 200 outlets apart from Shopping Mall including a Hypermarket and a spacious food court. This project is initiated on the directions of President Sheikh Khalifa Bin Zayed Al Nahyan and the project is being developed in association with Mubadala Development Company on a Mubadala owned estate in the heart of the city with easy accessibility and a parking capacity of more than 3500cars.

Description

The market consist Basement, Ground Floor, Three Floors, roof and Top Roof. Basement floor is for parking, Ground floor is for 75 fish shops, 90 meat shops, 60 vegetable shops and parking, 1st Floor is for 62 shops, 13 stores, prayer room & wash room facilities. 2nd Floor for Hyper Market, shops and 3rd Floor for food court, restaurants, food outlets, family entertainment hall and electronic games centre. Two tents are provided at top roof level to increase the aesthetic of the building. The fish market will have a common fish cleaning hall and an international standard fish waste processing plant which ensures a totally hygienic and odorless market. Each shop will have separate cold storage facilities and it includes specialty shops where customers can purchase live fish.

Client

Line Investments & Property L.L.C, a division of EMKE Group

Role of RTC

As a sub consultant RTC Consultants has carried out the Traffic Impact Study for the specific project. The purpose of this Traffic Impact Assessment is to document the existing and anticipated project specific traffic impacts associated with the proposed Fish Market located in Sector E-32 in the City of Abu Dhabi, United Arab Emirates.

Scope of Work
  • Liaising with DOT and Abu Dhabi Traffic police
  • Traffic Count
  • Micro modeling, trip distribution assignment and mode split
  • Traffic impact analysis
  • Parking requirements
  • Site access and circulation
  • Traffic impact study report
  • Car parking- concept design
  • Road idening and newly proposed mitigation measures.
The Project Location

The project site is located in sector E32 on the northwest quadrant of the intersection of Airport Road (2) and Ghantoot Street (25), Abu Dhabi, U.A.E

Project Start Date

January 2008

Project Duration

24 Months

Actual Value

275Million US$

Total Built Up Area

90,000 M2
For more information please contact
Mona Nasr, mnasr@rtcme.com

- CRTC CLIENTS -